Concrete Mould – Headstock Shell

Home > Steel Fabrication > Completed Projects

Recently fabricated and instal l concrete mould for casting Headstock Shell’s for the Richmond River bridge.

 

Reo installed in the mould ready for concrete.

Lifting the insert into the outer shell.

Concrete Mould being lifted from the steel mould.

The finished product being transported to site.

Hi-Rail System for Komatsu Crawler Tipper

The rail guide system has been designed for driving the Komatsu CD60R-1A Carrier / tipper on NSW standard...

All the major brands

Sable Engineering & Metaland Pty Ltd

18 Yarrawonga Street
Macksville, NSW 2447

Ph: 6568 2014

Email: info@sable.net.au

© Sable Engineering 2013 - 2025 All Rights Reserved :: Website by Giant Media :: ADMIN