Nambucca 2 Urunga Highway Upgrade Structural Steel Platforms & Walkway Brackets

Home > Steel Fabrication > Completed Projects

Fabrication of structural steel platform frames, walkway Trusses and Walkway brackets for the Nambucca 2 Urunga Highway Upgrade.

Fabricated, sandblasted and painted in our workshop.

 

Hi-Rail System for Komatsu Crawler Tipper

The rail guide system has been designed for driving the Komatsu CD60R-1A Carrier / tipper on NSW standard...

All the major brands

Sable Engineering & Metaland Pty Ltd

18 Yarrawonga Street
Macksville, NSW 2447

Ph: 6568 2014

Email: info@sable.net.au

© Sable Engineering 2013 - 2025 All Rights Reserved :: Website by Giant Media :: ADMIN