Home > Steel Fabrication > Completed Projects
Fabrication of structural steel platform frames, walkway Trusses and Walkway brackets for the Nambucca 2 Urunga Highway Upgrade.
Fabricated, sandblasted and painted in our workshop.
This job was ongoing for a period of 18 months and consisted of mainly aluminium, stainless steel and...




18 Yarrawonga Street
Macksville, NSW 2447
Ph: 6568 2014
Email: info@sable.net.au