Nambucca 2 Urunga HIghway Upgrade ConcreteFormwork Steel Moulds

Home > Steel Fabrication > Completed Projects

Fabrication of Steel formwork & Moulds for the Nambucca 2 Urunga Highway upgrade.

1800mm Diameter Concrete Column form fabricated and assembled in our workshop.

 

 

 

 

 

 

Concrete Mould – Headstock Shell

Recently fabricated and instal l concrete mould for casting Headstock Shell’s for the Richmond River bridge.   The...

All the major brands

BOC Equipment partner

Sable Engineering & Metaland Pty Ltd

23 Yarrawonga Street
Macksville, NSW 2447

Ph: 6568 2014

Fax: 6568 2742

© Sable Engineering 2013 - 2018 All Rights Reserved :: Website by Giant Media :: ADMIN