Concrete Mould – Headstock Shell

Home > Steel Fabrication > Completed Projects

Recently fabricated and instal l concrete mould for casting Headstock Shell’s for the Richmond River bridge.

 

Reo installed in the mould ready for concrete.

Lifting the insert into the outer shell.

Concrete Mould being lifted from the steel mould.

The finished product being transported to site.

Structural Steel – Stairs, Ramps & Balustrade

Fabrication of Structural Steel, Ramps, Stairs and balustrading. All Fabrication done in our workshop. Galvanised at Galvanising servies...

All the major brands

Sable Engineering & Metaland Pty Ltd

23 Yarrawonga Street
Macksville, NSW 2447

Ph: 6568 2014

Fax: 6568 2742

© Sable Engineering 2013 - 2018 All Rights Reserved :: Website by Giant Media :: ADMIN